1. SITE PREPARATION
* This process typically takes 1-2 weeks depending on weather.
| SITE PREPARATION: To start the process of building, Greg will...
1. Obtain well, septic, and building permits. 2. Clear wooded lots for building site. 3. Build the driveway. 4. Dig and install the foundation. 5. Install well and septic system. 6. Modular Home - the site is ready for delivery. |
2. BUILD STRUCTURE
* This process typically takes 2-4 weeks depending on the size of the structure.
| BUILD STRUCTURE ON SITE:
1. Frame and roof. 3. Close in the house with windows and doors. |
3. INTERIOR CONSTRUCTION
* This process typically takes 2-4 weeks depending on the size of the structure.
| INTERIOR CONSTRUCTION:
1. Utilities - Rough in the electrical wiring and plumbing. 2. Insulate. 3. Drywall is hung or wall coverings are installed. |
4. INTERIOR FINISH WORK
* This process typically takes 3-4 weeks depending on the size of the structure.
| INSIDE FINISH WORK:
1. Paint the walls, ceilings, and trim. 2. Set the Bath and Kitchen fixtures & cabinets are installed. 3. Install light, receptacles, and switches. 4. Install floor coverings. |
5. FINISH EXTERIOR
* This process typically takes 2-4 weeks depending on the size of the structure.
| FINISH EXTERIOR:
1. Porches, garages, decks are installed. 2. Install siding, brick, and stone. 3. Final grading and seeding. 3. Any other landscaping. |